Skip to Main Content

Pass period key for Batch Load in EPBCS Data management

SenthilSSNOct 18 2019 — edited Oct 19 2019

Hi,

Is it possible to specify the period key for batch Job?  I don't want to use file. I am trying to get the Actual period using Subvar and use it in the batch load instead of the Data Load rule option?

This post has been answered by JohnGoodwin on Oct 19 2019
Jump to Answer
Comments