Why : Data Control entry not expandable/empty - ADF Task flow based on HT.
942263Jul 3 2012 — edited Jul 3 2012Hi All,
I've hoping to create an ADF Task flow based on a human task. I have a stand alone ADF application within the ViewController of which I am attempting to create this task flow. The resultant data control entry doesn't seem to be expandable.
Questions
1. When creating an ADF Taskflow based on a human task, should it always be within a project in the same application as the SOA components?
2. If no, is the resultant human task data control empty or not expandable because the xsd for the HT is based on the MDS? I have configured all the MDS connections within my application.
JDev : 11.1.1.4
Thanks
PP