Currently there is no validation to stop a Work Order from going to a Closed or Canceled Status if a Material Request is in a Created or Ready to Issue Status. WACS really shouldn't allow this. This is leaving stranded open Material Requests throwing off reorder points, demand, etc from an inventory management perspective. On the work side, this is not reflecting true costs when integrated to Fusion as these transactions have never been sent over. Although you can reopen a work order in WACS, the integrations to Fusion don't allow the transactions to flow as Fusion considers the WO closed and doesn't get reopened.