Upgrade from 10g to 11g
Upgrade scenario: 10.2.0.5 to 11.2.0.3 patch 10 on Windows 2003 32 bit
1. Install Oracle 11g software
2. Perform patching steps "opatch apply" as well as run the script utlrp.sql (do not run catwinbundle.sql here) ( patchset 14 latest , is it rite? )
3. Update Oracle Instant Client Software
4. Copy the SQL*Net files from the Oracle 10g home to the Oracle 11g home
5. Prepare system for DBUA upgrade (remove ORACLE_HOME and TNS_ADMIN variables)
6. Perform upgrade using Database Upgrade Assistant
7. Run post-upgrade scripts (post_upgrade_tasks.sql, upgrade_tstz.sql, set_compatible.sql, post_upgrade_status.sql) -- mention any other scripts to perform
8. Run catwinbundle.sql from patch directory
9. Any other remaining post-upgrade steps, if so, kindly provide me?
Is this correct? Kindly help me
Thanks,
Vikhar