Skip to Main Content

Analytics Software

Announcement

For appeals, questions and feedback about Oracle Forums, please email oracle-forums-moderators_us@oracle.com. Technical questions should be asked in the appropriate category. Thank you!

The maximum number of concurrent connections has exceeded a limit.

BIDevNov 1 2012 — edited Nov 4 2012
Hi Experts,

In OBIEE 11.1.1.6.0 , when I send the report through agent, it will show the following error message as below:
AgentID: /shared/Agents/TTL Loading Overview
[nQSError: 75004] Failed to send HELO command. 4.3.2 The maximum number of concurrent connections has exceeded a limit, closing transmission channel AgentID: /shared/Agents/TTL Loading Overview
...Trying SMTP Delivery loop again... Sleeping for 4 seconds. AgentID: /shared/Agents/TTL Loading Overview
[nQSError: 75004] Failed to send HELO command. 4.3.2 The maximum number of concurrent connections has exceeded a limit, closing transmission channel AgentID: /shared/Agents/TTL Loading Overview
...Trying SMTP Delivery loop again... Sleeping for 4 seconds. AgentID: /shared/Agents/TTL Loading Overview
[nQSError: 75004] Failed to send HELO command. 4.3.2 The maximum number of concurrent connections has exceeded a limit, closing transmission channel AgentID: /shared/Agents/TTL Loading Overview
...Trying SMTP Delivery loop again... Sleeping for 3 seconds. AgentID: /shared/Agents/TTL Loading Overview
[nQSError: 75004] Failed to send HELO command. 4.3.2 The maximum number of concurrent connections has exceeded a limit, closing transmission channel AgentID: /shared/Agents/TTL Loading Overview
Exceeded number of SMTP delivery retries.

Are you facing the issue before?
I think it exceeds the maximum number of concurrent connection, but I do not know how to configure or change the information. Thanks.
Comments
Locked Post
New comments cannot be posted to this locked post.
Post Details