Hi,
i have some problems with scheduled task flow.
When i scheduled a task flow, if the first step is longer than one hour, the second steps doesn't start.
For example last night i scheduled a consolidation taskflow with 7 steps.
After the first steps the taskflow stop.
The first step start at 06.50 (PM) and finish at 12.05 (AM).
Someone had the same problems?
I found in the forum a relative thread (
879849 but the solution doesn't work on my system.
Thanks,
Vincent