When scheduling a draw the options that are allowed are from the screenshot below:

I would love the option for there to be a “specify subcontracts” where you could then manually add draw participants. There are situations in phased projects where not every subcontract is applicable for a phase/draw. Being able to specify this will make the schedule draws feature able to be used on those projects and miss delays from manual entry. If this were completed, then our team would be able to schedule draws regardless of complexity and be able to have it setup one time rather than missing a draw participant and resulting in a late bill submission. This would save time each month from manually specifying each participant on a multi-phase job. In its current form, it is un-usable for these multi-phased complex projects.