Run a job every 30min but only from 6am to 6pm
463258Jun 14 2006 — edited Sep 7 2007I have a job that runs every 30 mins to process orders, and email failures. I only want this job to run from 6or 7am to 6pm M-F. I have other jobs that run once a day starting 1 minute past midnight. and and 4am. I do not want any conflicts as the both read the same tables. Using Enterprise Manager in 10g, I can only see how to schedule a job to repeat and start and stop but I want it to resbmit the schedule.
Is this possible or will I have to schedule a 25 jobs to run ever 24hrs?
thanks
bj