Skip to Main Content

Oracle Database Discussions

Announcement

For appeals, questions and feedback about Oracle Forums, please email oracle-forums-moderators_us@oracle.com. Technical questions should be asked in the appropriate category. Thank you!

Rolling Upgrades in Rac

728006May 20 2010 — edited May 21 2010
Hi All,

can you please explain abt rolling upgrades in rac env

suppose i am having rac setup on 10.2.0.1 if i want to apply patch set 10.2.0.4 is it required downtime

As per the readme of 10.2.0.4

1)Stop every thing on node 1 and apply patch set
2)stop every thing on node 2 and apply patch set
3)stop the database and run the catupgrd.sql script.


My question is for running catupgrd script i have to bring down the db so what the meaning of rolling upgrade??

And in this type of sece which type of upgrade is best one rolling or non-rolling.


KK

Edited by: user12061936 on May 20, 2010 2:35 PM
Comments
Locked Post
New comments cannot be posted to this locked post.
Post Details
Locked on Jun 18 2010
Added on May 20 2010
5 comments
1,419 views