Resuming the execution of scenario from the failed interface.
689307Sep 22 2010 — edited Sep 23 2010Hi,
I have 10 interfaces and I have created a package with all the interfaces and then created a scenario for this package.
Now when I start executing the scenario, if there is any error in the 5th interface and if the scenario execution is stopped, how can I resume the execution of the scenario from the 5th interface.
please help with this scenario
Thanks.
Varma