Process scheduler does not start
Hi,
I 'm in 84.6.01 with an Oracle 9.2.0 database. AS PS and DB are on the same machine (Win 2003 server). DB started. AS started but Process Scheduler does not start with :
exec PSDSTSRV -p 1,600:1,1 -sPostReport -- -C psprcs.cfg -CD C89LAFDV -PS PSNT -
A start -S PSDSTSRV :
CMDTUX_CAT:1685: ERROR: Application initialization failure
tmboot: CMDTUX_CAT:827: ERROR: Fatal error encountered; initiating user error ha
ndler
tmshutdown -y
Shutting down all admin and server processes in P:\PSOFT\CRM89MP2PT84601\appserv
\prcs\C89LAFDV\PSTUXCFG
And in TUXLOG.022008 :
111451.SERVERNAME!PSDSTSRV.3664.3668.0: LIBTUX_CAT:250: ERROR: tpsvrinit() failed
111451.SERVERNAME!tmboot.3436.2808.-2: 02-20-2008: Tuxedo Version 8.1, 32-bit
111451.SERVERNAME!tmboot.3436.2808.-2: tmboot: CMDTUX_CAT:827: ERROR: Fatal error encoun-tered; initiating user error handler
111454.SERVERNAME!BBL.192.3328.0: CMDTUX_CAT:26: INFO: The BBL is exiting system
Any idea ?
Many thanks.