ISSYS_MODIFIABLE false in RAC
505789Jun 12 2012 — edited Jun 12 2012Hello,
In a RAC environment with two nodes when we need to modify a parameter that is ISSYS_MODIFIABLE false, can we stop/start one instance at a time and that would work?
Any advice?
Thank you.