Installation is stuck on 35% of Database Configuration Assistant
first time to run database installation 11.2.0.3 by starting off runInstaller, and has gone alright until about 35% of Database Configuration Assistant. Based on the window, it is copying database files, and clone database creation in progress. However, it's been 2 hours now, it is hanging there.
the main installation window has shown step 10 of 11, 83% is done, "oracle database configuration" and "oracle database configuration assistant" is in progress, others are succeeded.
what could be the cause? what I should do differently? I tried 2 times, and stopped at same point. the following is the end portion of the installation log:
Setting up 'Oracle Database 11g 11.2.0.3.0 '
Executing utility tool: ADR Setup Utility
Successfully executed utility tool: ADR Setup Utility
Starting 'Oracle Net Configuration Assistant'
Completed 'Oracle Net Configuration Assistant'
Starting 'Oracle Database Configuration Assistant'
cat /u01/app/oracle/cfgtoollogs/dbca/orcl9/CloneRmanRestore.log
ORACLE instance started.
Total System Global Area 1.0055E+10 bytes
Fixed Size 2237008 bytes
Variable Size 1543507376 bytes
Database Buffers 8489271296 bytes
Redo Buffers 19767296 bytes
ps -ef | grep pmon
oracle 5794 1 0 10:28 ? 00:00:02 asm_pmon_+ASM
oracle 22769 1 0 14:43 ? 00:00:00 ora_pmon_orcl9
Please help me out!
Edited by: 943714 on Apr 12, 2013 12:42 PM