Importing database without jobs from scheduler.
737952Dec 2 2009 — edited Dec 4 2009Hi!
Oracle 10g
The database was fully exported with scheduled jobs with interval of 2s.
How to import such a database without jobs from scheduler?
The thing is that I have to import database and I cannot allowed to run this scheduled jobs.
Can I somehow omit jobs from scheduler during the importing of database?
Greetings