HOW TO SCHEDULE A JOB TO RUN EVERY 30 MINS WITHOUT USING SCHEDULAR?
496810Dec 14 2011 — edited Dec 16 2011Hi,
I have a requirement where i need to schedule the job to run every 30 mins for 10 am to 10 pm. I ran into problems using odi schedular. Let me tell you what i did..
i have chosen the active mode between 10 am to 10 pm
selected on startup/simple.
and on the repetitions tab selected many times with 30 mins duration.
the problem was-----
a)it was not stopping at 10 pm but continues after 10 pm
b)randomly picking up more times than the 1/2 hour duration.
looking for---
a solution that runs my scenario every 30 mins from 10 am to 10 pm without using the schedular...which i cannot trust.
Regards
Venkat