How to run report on server side with time schedule
89842Aug 17 2005 — edited Aug 17 2005I have some reports require to run for a long time, but the connection of my workstation with my Oracle server will be changed from 100M local to 4M VPN. I can foresee that it will affect the processing time of my long tasking reports.
Can I have any procedures to running the reports on Server side with time schedule without require to rewrite all of my reports?