Skip to Main Content

DevOps, CI/CD and Automation

Announcement

For appeals, questions and feedback about Oracle Forums, please email oracle-forums-moderators_us@oracle.com. Technical questions should be asked in the appropriate category. Thank you!

How to run report on server side with time schedule

89842Aug 17 2005 — edited Aug 17 2005
I have some reports require to run for a long time, but the connection of my workstation with my Oracle server will be changed from 100M local to 4M VPN. I can foresee that it will affect the processing time of my long tasking reports.

Can I have any procedures to running the reports on Server side with time schedule without require to rewrite all of my reports?
Comments
Locked Post
New comments cannot be posted to this locked post.
Post Details
Locked on Sep 14 2005
Added on Aug 17 2005
2 comments
276 views