How to progress EDQ process that hangs part way through

1929234Mar 22 2017 — edited Mar 23 2017

Hi,

I've kicked off an EDQ process that has previously come back fairly quickly (within a few seconds) however it is now hanging at 38% through.

After some minutes I tried cancelling (keep results option) however still the green arrow is showing against the process and it is showing in the tasks in the bottom left of Director.

Please could you advise what the DBAs/admins should check/do to address this.

I have already requested a restart of EDQ once today which allowed me to re-run the process (which was previously locked since it was 'running' and cancel had not in fact cancelled it).

I saw a similar post:

how to cancel a edq process which is stuck

however can't see what the solution to that was (or whether there was in fact a bug).

Thanks, Nik