How to deal with stanging on source side?
697768May 4 2009 — edited May 6 2009How can I avoid to use staging on the source side ? Most of the time, a Production environment could be considered as source for ODI and it's risky to allow write access for temporary tables/views created in the stage area.
A -> B
in Topology I defined:
source: schema A1 / stage A2
target: schema B1 / stage B2
Can I reference in an interface the staging area from target (B2) rather then one from source (A2) when I have to transfer data from A to B ?
Thank you !