How to change status of a GG process from ABENDED to STOPPED
933968Feb 26 2013 — edited Apr 27 2013Hi,
In my setup, one of the goldengate process is ABENDED. Now I want to change the status of this process as STOPPED.
what is the procedure.
with regards
vina