Skip to Main Content

Analytics Software

Announcement

For appeals, questions and feedback about Oracle Forums, please email oracle-forums-moderators_us@oracle.com. Technical questions should be asked in the appropriate category. Thank you!

HFM Consolidations using Task Flow Automation

Terri TMar 27 2009 — edited Mar 5 2013
I have created a task flow that has 5 stages (each stage having a success and a fail link). The first stage is set to consolidate (Impacted) our Actuals scenario for 6 years for 3 entity trees). The 2nd stage consolidates a different scenario for 3 yrs for 3 trees, etc. The task flow seems to "stop" in Stage 1 after consolidating all 3 trees for a few years. If I look in the View Taskflow status, the task flow still shows as being active; however if I look under Running Tasks, it shows nothing is running. If I look under Task Audit, it shows the last consolidation finished. I run into this same problem both when I schedule the task flow and when I run it manually. It consolidates a few years and then stops (and it's still in the first stage). I looked in the Event log on the HFM server and don't see anything that looks suspicious. Has anyone else had this problem?

Also one more question - when I go to automate the task flow, why does the server time stamp listed there not match the clock on the server? I'm remoted into the server and the clock on the task bar says 9am, but the Server Date showing on the Starting Event tab shows 8am.

Thanks.

Terri
Comments
Locked Post
New comments cannot be posted to this locked post.
Post Details
Locked on Apr 2 2013
Added on Mar 27 2009
17 comments
8,447 views