Hi,
I'm looking at the latest 11.2.0.3 PSU (11.2.0.3.6) for Grid Infrastructure (GI) homes. The README states that this PSU is rollable. Can any anyone answer if this is applicable to both the apply and rollback of the PSU to the GI home?
i.e If you apply the patch in a rolling fashion can you also rollback in a rolling node by node fashion?
I'm working on Linux (OEL5) and UNIX (AIX5.3). The clusters are all 2 or 4 nodes currently running 11.2.0.3.2 or .3
Thanks