Estimating Export and Import time
529403Sep 12 2006 — edited Sep 13 2006I know that the time it takes to perform an export or an import has many determining factors, but I was wondering if there is any way to predict the optimal time it would take to perform either the import or export. We are trying to plan a migration of 70 different databases of varying sizes between 1GB and 400GB.
If there is no real way to predict this other than actually performing either action, then I guess we'll just have to do that.