Hi DBAs,
ENV : 11gR2, Windows 2008 server, 64bit,RAM=12 gb,
DB size=370 gb., SGA=5 gb, ASMM=enabled.
We need to move this database to Windows 2012 server which runs on Hyper-V. Can you guys suggest what are the best methods to move with limited downtime ?
If we opt for RMAN, is there any way to measure to estimate backup size ? ( at-least, approximate size) and how much time it takes to complete?
Please share your thoughts !!
Thanks,
Hari