Upgrading from a Windows Server 2012 running Planning Version 11.1.2.4 to Windows Server 2019 Planning Version 11.2.6. Everything is taking 3-4x longer to run in the new version, from imports, business rules and calcs. I can confirm that essbase.cfg and outline is the same. The only way to speed up the new environment is to set the database setting Committed Blocks to 0 (the old environment is defaulted at 3k), but it is still taking a lot longer than the old environment. Are there other settings that could cause the performance difference?