EDMCS received a patch update in Sept in which OOB connections are possible between EDMCS and ERP GL. We had switched our design to follow this logic. We have integration testing upcoming in which we have re-tested the export and import processes via connection between both applications. The job runs from EDMCS and the Import in ERP GL but EDMCS demonstrates an error message despite both applications being successful: The export could not be uploaded to connection 'GL_Connection' due to an error: 'Process and publish account hierarchies failed because of the following reason: System is not responding during call to validate results'
The system does not respond that the ERP GL has successfully completed therefor produces a failed job notification within EDMCS. If we run the job again right after this then it completes successfully and we have not been able to recreate the situation as it only happens randomly. Please advise if you have encountered this as well.