Skip to Main Content

Analytics Software

Announcement

For appeals, questions and feedback about Oracle Forums, please email oracle-forums-moderators_us@oracle.com. Technical questions should be asked in the appropriate category. Thank you!

DAC task shows as Running when in fact Informatica workflow is completed

user12221504Aug 1 2011 — edited Aug 4 2011
Good day,

My environment:
Dac Build AN 10.1.3.4.1.20090415.0146 , Windows 2003 Server Release 2
Informatica 8.1.1. SP5 0129 135 (R117 D86) , Windows 2003 Server Release 2

I am having two separate issues with a DAC execution plan.

1. During the runtime of DAC execution plan some SDE mapping which were completed in Informatica still being displayed with status ‘Running’ in DAC. As a result not all SIL mapping get executed. I am able to unit test this mapping (both SDE and SIL), so the problem is not with Informatica.

2. Even though the execution plan was generated with an option for both FULL and Incremental tasks each time I submit the execution plan the FULL mapping gets executed. $$LAST_UPDATE_DATE variable is defined in both Informatica and DAC.

Any help is greatly appreciated.

Thank you,

Maxim
This post has been answered by Ahsan Shah on Aug 4 2011
Jump to Answer
Comments
Locked Post
New comments cannot be posted to this locked post.
Post Details
Locked on Sep 1 2011
Added on Aug 1 2011
3 comments
398 views