Hi All,
I have scheduled a batch script to refresh the cube that's runs CubeRefresh.cmd utility. The job status shows complete and job console in workspace shows refresh status as completed.
But when I check with the essbase outline, its not updated with the changes. Planning log shows nothing so which log do I check to know what is the issue?
Has anyone faced similar issue?
I'm on Planning 11.1.2.4 on premise and have two separate servers for Application and Essbase Database.
Thanks in advance!