Hi,
This question is for 12.1.0.2 on Windows 2012 64-bit. Many of the internal automated Oracle jobs (e.g. stats gathering) are overlapping with other application jobs. I'm confused at what the proper commands are for changing the start/stop times for the maintenance window for these jobs. Do I change the window, set_attribute, etc...
Can someone tell me the proper commands to show and change the start and stop time for the internal maintenance window/job?
Thanks...