Skip to Main Content

Oracle Database Discussions

Announcement

For appeals, questions and feedback about Oracle Forums, please email oracle-forums-moderators_us@oracle.com. Technical questions should be asked in the appropriate category. Thank you!

Change maintenance window start/stop times

WoodyMcKayApr 9 2015 — edited Apr 10 2015

Hi,

This question is for 12.1.0.2 on Windows 2012 64-bit. Many of the internal automated Oracle jobs (e.g. stats gathering) are overlapping with other application jobs.  I'm confused at what the proper commands are for changing the start/stop times for the maintenance window for these jobs.  Do I change the window, set_attribute, etc...

Can someone tell me the proper commands to show and change the start and stop time for the internal maintenance window/job? 

Thanks...

This post has been answered by unknown-7404 on Apr 10 2015
Jump to Answer
Comments
Locked Post
New comments cannot be posted to this locked post.
Post Details
Locked on May 8 2015
Added on Apr 9 2015
8 comments
2,340 views