Hi guys,
I'm wondering how biee caculate the pencentage of each stage if i choose Last-stage Only.
Please check below snapshot as belows(Funnel graph with Last-stage Only, First stage 5 X final stage target value):

The first stage i m trying to calc like this: (28/30\*5)=0.1867, so this is 18.67% with percentage.
But for the other stage how it is calculate, such as 84.56%, 55.88%, 84,97% etc.
Apprecatiated if you can share the rules.
Thanks and Regards,