Skip to Main Content

Database Software

Announcement

For appeals, questions and feedback about Oracle Forums, please email oracle-forums-moderators_us@oracle.com. Technical questions should be asked in the appropriate category. Thank you!

Best practice for RAC planned downtime maintenance?

user569151Oct 31 2012 — edited Nov 3 2012
I have a 3 node RAC on Linux redhat. DB version is 11gr2.

I want to know the steps to perform each node OS patch upgrade.

I want to be sure I did right steps:
1). Node 1, stop crs and do the OS patch upgrade.
2). same steps for Node 2, 3.

Is this right?

Thank you for any help.
Comments
Locked Post
New comments cannot be posted to this locked post.
Post Details
Locked on Dec 1 2012
Added on Oct 31 2012
8 comments
622 views