Currently the Unit Of Time field on a Work Activity requires manual selection of the value after entering the Duration. It would be nice to be able to, within standard configuration, have a setting where this value can be defaulted so when entering a Duration you don't have to manually select a value. Then, if desired, a person can manually change the value if the default isn't what they want.