Hi,
environment is Cloud Control 12.1.0.4 and the actual agent on the server running.
We have a production and integration environment with around 200 databases for the Backup.
All Prod databases have are RAC and they have a Data Guard on a DR Site.
The Backup and all jobs for these databases will be managed by 12 Cloud Control.
Up to now we made the whole scheduling of these databases more or less via a Excel Sheet which is a bad solution.
Does anybody have a better way how we can do the scheduling of the databases via 12c Cloud Control?
Does anybody implement a Cloud Control solution?
Another problem is that all the job which we have to create for inc0 inc1 and arc backup created via the long steps inside Cloud Control?
Are there any good examples to made these kind of jobs via emcli or is there a better solution?
regards